Carbon Steel ASTM A105 Spectacle Blind Cl150
Low and middle pressure fluid pipeline,boiler,petroleum and natural gas industry,drilling,chemical industry,electric industry,shipbuilding,fertilizer equipment and pipeline,structure,petrochemical,pharmaceutical industry.
Always customer-oriented, and it's our ultimate goal to get not only by far the most reputable, trustable and honest supplier, but also the partner for Carbon Steel Eccentric Reducer, Steel Flange Plate, Steel Flange. We aspirate to do cooperate with all different manufacturers, then create a beautiful future! Welcome all customers both at home and abroad to visit our factory. Our goal is to strive to achieve steady improvement in product quality with competitive prices to deliver it timely and reliable ensuring customers' satisfaction with the service.
Sometimes you just need to shut a line down-safely, completely, and without second-guessing. That is exactly what a JIS B2220 Blind Flange delivers.
We are Hangxin. We have been forging flanges since 1993. Our JIS Steel Blind flanges do not go into storage racks. They go onto pipelines where a leak means lost production, environmental fines, or worse. Every piece we ship has one job: seal that opening and stay sealed.

One Feature That Changes Everything: Full-Face Forged Density
Here is where most blind flanges fall short. Cast or cheaply forged blanks have micro-voids inside. Under pressure, those voids become leak paths. You cannot see them. You cannot test for them without cutting the flange open.
We solve this with controlled forging density.
Each JIS Steel Blind flange starts as a cut billet of certified carbon steel (ASTM A105) or stainless steel (304/316). We heat it evenly, then press it under our 3500T hydraulic press-not once, but with staged reductions that close internal gaps. The grain structure compresses and flows around the flange face, not through it.
What comes out of the press is a solid disk with uniform material density from center to edge. No porosity. No hidden channels. When you torque this blind flange against a gasket, the entire face applies even pressure. Gasket creep drops. Bolt load holds longer.
We then machine the face with a serrated finish (concentric or spiral). That texture bites into soft gaskets-spiral wound, graphite, or non-asbestos. The combination of dense steel and aggressive face serration means your seal tolerates thermal cycles and pressure spikes that would blow out a lesser flange.
Carbon steel units get black anti-rust oil or optional galvanizing. Stainless units ship clean or pickled. Either way, you install once and forget it.
Where This Matters Most
|
Application |
Why the Blind Flange Works |
|
Shipbuilding – ballast line isolation |
Saltwater and vibration do not break the forged seal |
|
Petrochemical – reactor loop capping |
Handles chemical exposure without face corrosion |
|
Power plant – steam header dead end |
Thermal expansion does not loosen bolt torque |
|
Building pipeline hardware – permanent branch closure |
Zero maintenance after installation |
|
Pharmaceutical – sterile line blocking |
Stainless finish eliminates bacterial traps |
Technical Specifications
|
Flanges Size |
1/2"-72" |
|
Pressure |
150#,300#,600#,900#,1500#,2500# |
|
Standard |
GB/T17185-1995,ANSI B16.5,JIS B2220,DIN2633,ASME,ASTM,JIS,DIN,EN,etc |
|
Material |
Q235,20#,A105,Q345,WPL6,304,304L,316,316L,WP11,WP12,WP22,WP91 |
|
Application |
Low and middle pressure fluid pipeline,boiler,petroleum and natural gas industry,drilling,chemical industry,electric industry,shipbuilding,fertilizer equipment and pipeline,structure,petrochemical,pharmaceutical industry |
|
Surface |
transparent anti rust oil,yellow anti rust oil,black paint,accroding to the clients request |
|
Package |
Plastic film,wooden cases,wooden pallet or on customers'request |
|
Certificate |
ISO9001:2008,SGS,BV,etc |
|
Capacity |
800000tons/year |
|
Advantages |
1.Reasonable price with excellent quality |
Four Times the Blind Flange Earned Its Keep
Shipyard in Busan, South Korea
An LNG carrier needed 12 blind flanges to seal fuel lines during engine overhaul. The owner had been burned by off-size flanges that required field drilling. Our JIS B2220 blind flanges matched the existing bolt pattern exactly. Installation took four hours instead of two days.
Chemical processor in Thailand
Recurring pinhole leaks from cast iron blinds caused monthly production stops. They switched to our forged stainless 316L blind flanges. Fourteen months later, the maintenance log showed zero blind flange-related failures. The plant manager now orders by the pallet.
Building contractor in Dubai
A 40-story tower needed temporary caps on chilled water loops during floor-by-floor construction. They ordered 200 pieces of JIS 10K blind flange across six sizes. Every unit passed on-site hydrotest. No returns. No rework.
Oil service company in Russia
Winter pipeline isolation required blind flanges rated for -40°C. Standard carbon steel becomes brittle at that temperature. Our low-temperature forged blind flanges passed third-party impact testing at -46°C. The customer now stocks them as standard spare parts across three facilities.
Ready to Order? Tell Us What You Need.

Send us your JIS rating, size, material, and quantity. We will reply with a price and confirmed lead time within 24 hours.
Call or message:
Mob: +8618931763322 (WhatsApp / WeChat)
Email: admin@yongxingflange.com
From our factory to your site:
120 kilometers to Xingang Port for sea freight. 260 kilometers to Beijing Capital International Airport for air freight. We ship DHL, FedEx, or UPS for urgent orders.
Our Service Commitment
OEM welcome – send your drawing or special design requirements
Stock items ship within 3–5 business days
Custom production: 15–30 days depending on quantity
FAQs (Frequently Asked Questions)
Are you trading company or manufacturer ?
+
-
We are factory.
How long is your delivery time?
+
-
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Do you provide samples ? is it free or extra ?
+
-
Yes, we could offer the sample for free charge but do not pay the cost of freight.
What is your terms of payment ?
+
-
Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
We have been engaged in the Carbon Steel ASTM A105 Spectacle Blind Cl150 industry for a long time, and has accumulated a lot of service experience. Welcome to inquire about our products and solutions. The above products have passed professional certification, and we not only can produce OEM-standard products but we also accept Customized Products order.
Hot Tags: jis steel blind, China jis steel blind manufacturers, suppliers, factory, Carbon Steel Threaded Flange, gost flange for automation, steel threaded flange for underwater applications, gost flange for delivery time, gost flange for infrastructure projects, DIN PN16 DN80 Carbon Steel Flange
[[ProKeywords]]Send Inquiry